BC Hydro MURB’s Incentive Program

MURB's in BC are eligible for up to 100% funding to carry out integrated Energy Audits, EPR, and EV Ready studies on your facilities.

Incentive Opportunities for BC Strata

Opportunity Assessment: Complete assessment of facility systems and equipment in order to identify energy efficiency options. Includes:

– Analysis of facility & equipment, including energy use breakdown

– Low to no cost tips to improve facility energy efficiency

Feasibility Study: A detailed technical and financial analysis for the specific retrofits the building is ready to undertake.

Electrical Planning Report (EPR): It is mandatory for strata complexes to complete an EPR to document the electrical capacity and needed upgrades for strata across the province of BC.

EV Ready Plan: A strategy that provides a minimum of one EV Ready parking space per residential unit – future-proofing your building to provide all residents with a simple process to access EV charging at their parking space.

The Benefits

  • Make energy efficiency upgrades that reduce energy bills. 
  • Make valuable, whole-building retrofits at a lower cost.
  • Increase your property’s value and lifespan by investing in modern equipment.
  • Improve your building’s comfort and resilience to extreme weather with new insulation, windows, and/or by adding cooling with heat pumps. 

Opportunity Assessment:

Optional Add-Ons:

BC Hydro is covering 100% of the costs for the Opportunity Assessment through Alliance Partners like SPG.

Contact SPG Today!

Discover how SPG can help you unlock substantial savings for your energy efficiency projects.

Comments

mood_bad
  • No comments yet.
  • Add a comment