BC Hydro MURB’s Incentive Program
MURB's in BC are eligible for up to 100% funding to carry out integrated Energy Audits, EPR, and EV Ready studies on your facilities.
Incentive Opportunities for BC Strata
Opportunity Assessment: Complete assessment of facility systems and equipment in order to identify energy efficiency options. Includes:
– Analysis of facility & equipment, including energy use breakdown
– Low to no cost tips to improve facility energy efficiency
Feasibility Study: A detailed technical and financial analysis for the specific retrofits the building is ready to undertake.
Electrical Planning Report (EPR): It is mandatory for strata complexes to complete an EPR to document the electrical capacity and needed upgrades for strata across the province of BC.
EV Ready Plan: A strategy that provides a minimum of one EV Ready parking space per residential unit – future-proofing your building to provide all residents with a simple process to access EV charging at their parking space.
The Benefits
- Make energy efficiency upgrades that reduce energy bills.
- Make valuable, whole-building retrofits at a lower cost.
- Increase your property’s value and lifespan by investing in modern equipment.
- Improve your building’s comfort and resilience to extreme weather with new insulation, windows, and/or by adding cooling with heat pumps.
Opportunity Assessment:
- On-site assessment
- Online access to assessment results
- Assessment Report including ECMs
- ESPM energy bill upload
Optional Add-Ons:
- Electrical Planning Report (EPR)
- EV Ready Report
BC Hydro is covering 100% of the costs for the Opportunity Assessment through Alliance Partners like SPG.
Contact SPG Today!
Discover how SPG can help you unlock substantial savings for your energy efficiency projects.
